Westendorp Logo Sigle

AboutRenovationPurchaseSaleRental


Work Workshop


Machines & Process of intervention

A laboratory analysis results :

  • Dielectrimeter Spintermetre 100 KV
  • Acid tester MAXEI
  • Gas chromatography

Specific equipment :

  • A checkpoint sealing
  • An oven 12 m3
  • A tank fill vacuum
  • VUF Maxei oil dehydration

Winding up of a local :

  • 1 winding machine Mecafil, 1300x600
  • 1 winding machine Maxei, 1300x500
  • 1 winding machine Maxei, 300x500
  • 2 winding machines Bobifil, 800x500

Intervention areas :

  • High pressure cleaning
  • Paint under water curtain
  • Workshop approved pyralene 100 m2

Platform test :

  • PROWATT 3 Chauvin Arnoux
  • ISOL 5003 Chauvin Arnoux EDF
  • Bridge NORMA
  • Frequency converter 250 Hz - 0 to 900 V

Controlled points


Timeline of Interventions
  1. Analysis of the dielectric
  2. Review of the diagnostic device
  3. Drain - Revaluation
  4. Removing the cover - switch
  5. Removing the upper yoke
  6. Dismantling windings HT
  7. Racking - Draining
  8. Expertise of the tank
  9. Cleaning and preparation
  10. Painting of the tank
  11. Control of the LV section
  12. HV winding columns
  13. Replace Insulation and cushioning
  14. LV winding columns
  15. Protection relay
  16. Charge controller
  17. Steaming
  18. Reassembly
  19. Provision of new oil
  20. Replacement joints
  21. Testing and test
  22. Compliance Validation

Renovation Process


Schema of the process of renovation