Work Workshop
Machines & Process of intervention
A laboratory analysis results :
- Dielectrimeter Spintermetre 100 KV
- Acid tester MAXEI
- Gas chromatography
Specific equipment :
- A checkpoint sealing
- An oven 12 m3
- A tank fill vacuum
- VUF Maxei oil dehydration
Winding up of a local :
- 1 winding machine Mecafil, 1300x600
- 1 winding machine Maxei, 1300x500
- 1 winding machine Maxei, 300x500
- 2 winding machines Bobifil, 800x500
Intervention areas :
- High pressure cleaning
- Paint under water curtain
- Workshop approved pyralene 100 m2
Platform test :
- PROWATT 3 Chauvin Arnoux
- ISOL 5003 Chauvin Arnoux EDF
- Bridge NORMA
- Frequency converter 250 Hz - 0 to 900 V
|
|
Controlled points
Timeline of Interventions
- Analysis of the dielectric
- Review of the diagnostic device
- Drain - Revaluation
- Removing the cover - switch
- Removing the upper yoke
- Dismantling windings HT
- Racking - Draining
- Expertise of the tank
- Cleaning and preparation
- Painting of the tank
- Control of the LV section
- HV winding columns
- Replace Insulation and cushioning
- LV winding columns
- Protection relay
- Charge controller
- Steaming
- Reassembly
- Provision of new oil
- Replacement joints
- Testing and test
- Compliance Validation
|
|
Renovation Process
Schema of the process of renovation
|
|